Installation procedure
![]() |
![]() |
![]() |
![]() |
Locating the postMark out required position of post and base plate fixing centres. |
Drilling into membraneUsing the 56 mm counter bore tool (part no: 00795-00), drill 4 holes centrally over the first set of holes to a depth of approximately 10 mm. The drilling device will ensure the hole will not be too deep |
Toggle guideInsert plastic toggle guide into the hole making sure it is pushed all the way through the timber deck. All guides indicate direction to be inserted. |
Positioning base plateFit all four toggle assemblies through the base plate. |
![]() |
![]() |
![]() |
![]() |
FixingAs you tighten the toggles with a battery drill the toggle bolts will adjust to sit horizontally under the timber deck securing the post in position. |
Protective capThe bolts are correctly tightened when the sealing washers are compressed. A plastic protective cap is fitted on top to sit flush in the recess. |
Welding membraneCut four pieces of membrane to cover the edges of the base plate then: |
End postsOn both end posts a D ring should be attached using a single M12 bolt. It should be tightened to a torque of typically 20 Nm, ensuring that the spring washer is flat. |
![]() |
![]() |
![]() |
![]() |
Intermediate postsOn the intermediate post attach the cable support with an M12 bolt, tightened to a torque of typically 20 Nm, ensuring that the spring washer is flat. |
Corner postsOn the corner post, fix a corner unit with an M12 bolt tightened to a torque of typically 20 Nm, so that the spring washer is flat. |
Variable postsThe variable bracket should be bent using the tube bending tool supplied by Latchways (part no: 85170). |
Fix the swageless terminal to yokeFit the swageless terminal according to the instructions supplied with the post. |
![]() |
![]() |
![]() |
![]() |
First end postAttach the swageless terminal to yoke: |
Thread the cableWhen all posts and bracketry are installed, thread the cable through the support brackets, checking that it is not twisted and is free from kinks. |
Second end postFit the long run line tenser, turnbuckle and swageless terminal unit to the D ring, ensuring that there is a maximum adjustment available in the turnbuckle. |
Cut the cableRemove the cable slack from the system, mark the position for cuttingand cut the cable to length. |
![]() |
![]() |
![]() |
|
Connect the systemRemove the swageless terminal from the turnbuckle body and attach the cable as per instructions provided. When the cable is locked in place, re-attach to the turnbuckle. |
Tension the systemTwist the turnbuckle to tension the system. |
Tension the systemTwist the turnbuckle to tension the system. |